{"id":170,"date":"2019-03-06T17:04:12","date_gmt":"2019-03-06T17:04:12","guid":{"rendered":"http:\/\/apps.lib.ua.edu\/blogs\/renovations\/?p=170"},"modified":"2019-03-06T17:06:00","modified_gmt":"2019-03-06T17:06:00","slug":"university-archive-facility","status":"publish","type":"post","link":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/03\/06\/university-archive-facility\/","title":{"rendered":"University Archive Facility"},"content":{"rendered":"\n<p>In addition to the Gorgas Renovation Project, we broke ground March 4, 2019 for the expansion of the University Archive Facility!<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<p>After three years of planning, &nbsp;construction of the\nUniversity Archive Facility has finally begun!&nbsp; The University Archive\nFacility is a structure that is approximately 15,000 square feet and will be\nbuilt as an addition to the Library Annex.&nbsp; Approximately 1\/3 of the new\nbuilding will be dedicated to space for Special Collections and 2\/3 of the\nspace will be used for general collections.&nbsp;&nbsp; The area for Special\nCollections will be constructed to withstand strong winds.&nbsp; Clean agent\nfire suppression equipment will be used throughout the new building, and high\nbay, mobile shelving will be installed to maximize use of the space.&nbsp; The\nUniversity Archive Facility is expected to be completed and ready for use by\nlate fall, 2019.&nbsp; <\/p>\n","protected":false},"excerpt":{"rendered":"<p>In addition to the Gorgas Renovation Project, we broke ground March 4, 2019 for the expansion of the University Archive Facility! After three years of planning, &nbsp;construction of the University Archive Facility has finally begun!&nbsp; The University Archive Facility is a structure that is approximately 15,000 square feet and will be built as an addition &hellip; <a href=\"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/03\/06\/university-archive-facility\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">University Archive Facility<\/span><\/a><\/p>\n","protected":false},"author":559,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-170","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/users\/559"}],"replies":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/comments?post=170"}],"version-history":[{"count":2,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/170\/revisions"}],"predecessor-version":[{"id":172,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/170\/revisions\/172"}],"wp:attachment":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/media?parent=170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/categories?post=170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/tags?post=170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}