{"id":502,"date":"2019-05-28T15:42:42","date_gmt":"2019-05-28T15:42:42","guid":{"rendered":"http:\/\/apps.lib.ua.edu\/blogs\/renovations\/?p=502"},"modified":"2019-05-28T17:25:51","modified_gmt":"2019-05-28T17:25:51","slug":"may-28-update","status":"publish","type":"post","link":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/05\/28\/may-28-update\/","title":{"rendered":"May 28 Renovation Updates"},"content":{"rendered":"\n<p>OUTSIDE: <\/p>\n\n\n\n<p>Utility work for water and sewer will begin this week on the west side of Gorgas.&nbsp; A fence will be put into place to enclose an area between the crosswalk near the Round House and the west end of the porch at Capstone.&nbsp; A protected alternate walkway and accessible entry point into the building will be provided.&nbsp; <\/p>\n\n\n\n<p>INSIDE:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Removal of old steam pipes from the tunnel (underneath 102 and\n104A) is complete. Sanitary and water lines will be installed in this tunnel.<\/li><li>Abatement around the elevator on the mezzanine level is complete.<\/li><li>Abatement in 203 is complete.<\/li><li>Demolition of JavaCity has begun.<\/li><li>Installation of temporary partitions has begun on 4M and upper\nfloors.<\/li><li>Abatement is scheduled for Monday in 303.<\/li><li>Installation of new sanitary line will begin today.<\/li><li>Site work for connection to water meter underneath Capstone Drive will\nbegin today.<\/li><li>Staff elevator cab has been disassembled. <\/li><li>Demolition in 203 and 104A has begun.<\/li><li>A wall will be constructed in 202.<\/li><li>The partition for work in 205 and 205C will be built this week. <\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>OUTSIDE: Utility work for water and sewer will begin this week on the west side of Gorgas.&nbsp; A fence will be put into place to enclose an area between the crosswalk near the Round House and the west end of the porch at Capstone.&nbsp; A protected alternate walkway and accessible entry point into the building &hellip; <a href=\"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/05\/28\/may-28-update\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">May 28 Renovation Updates<\/span><\/a><\/p>\n","protected":false},"author":559,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-502","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/users\/559"}],"replies":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/comments?post=502"}],"version-history":[{"count":3,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/502\/revisions"}],"predecessor-version":[{"id":506,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/502\/revisions\/506"}],"wp:attachment":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/media?parent=502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/categories?post=502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/tags?post=502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}