{"id":530,"date":"2019-06-14T14:20:07","date_gmt":"2019-06-14T14:20:07","guid":{"rendered":"http:\/\/apps.lib.ua.edu\/blogs\/renovations\/?p=530"},"modified":"2019-06-14T14:39:25","modified_gmt":"2019-06-14T14:39:25","slug":"phase-one-complete","status":"publish","type":"post","link":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/06\/14\/phase-one-complete\/","title":{"rendered":"Phase One Complete"},"content":{"rendered":"\n<p>The first phase of the restroom renovation project is\ncomplete.&nbsp; The sanitary drain line has been installed in the tunnel\nunderneath rooms 104 and 102, and the access hatches have been installed.&nbsp;\nThe rooms will be thoroughly cleaned and then turned back over to us for use\nearly next week.&nbsp; The furniture vendor will come next week to move the\nfurniture back into place, and technicians will reconnect electrical and data\nsupply.&nbsp; &nbsp;If everything goes as planned, we will reopen 102 and 104\nlate next week.&nbsp; There will be a small amount of work that will be done in\nthe south hallway of 102 later in the project, but that will not disrupt use of\nthe rest of &nbsp;the space in 102 or 104. &nbsp;&nbsp;<\/p>\n\n\n\n<p>#1 Installation of sanitary drain lines in tunnels\u2026.. \u221a<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first phase of the restroom renovation project is complete.&nbsp; The sanitary drain line has been installed in the tunnel underneath rooms 104 and 102, and the access hatches have been installed.&nbsp; The rooms will be thoroughly cleaned and then turned back over to us for use early next week.&nbsp; The furniture vendor will come &hellip; <a href=\"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/06\/14\/phase-one-complete\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Phase One Complete<\/span><\/a><\/p>\n","protected":false},"author":559,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-530","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/users\/559"}],"replies":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/comments?post=530"}],"version-history":[{"count":1,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/530\/revisions"}],"predecessor-version":[{"id":531,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/530\/revisions\/531"}],"wp:attachment":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/media?parent=530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/categories?post=530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/tags?post=530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}