{"id":730,"date":"2019-09-12T14:08:43","date_gmt":"2019-09-12T14:08:43","guid":{"rendered":"http:\/\/apps.lib.ua.edu\/blogs\/renovations\/?p=730"},"modified":"2019-09-12T14:08:43","modified_gmt":"2019-09-12T14:08:43","slug":"september-11-update","status":"publish","type":"post","link":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/09\/12\/september-11-update\/","title":{"rendered":"September 11 Update"},"content":{"rendered":"\n<p>You will begin to see some big changes next week on the first\nfloor of Gorgas.&nbsp; The construction barrier around the restroom area is\nscheduled to be taken down.&nbsp; Then, ceiling tiles and carpet will be put\nback into place and the walls will receive final touch-up paint.&nbsp; A new\nwater fountain (with bottle-filler and filter) will be installed.&nbsp; The\nfirst floor restroom is scheduled to be open and back on line before the end of\nSeptember.&nbsp; There will also be a Nursing Mothers Room adjacent to the\nfirst floor restrooms that will become available when the work in that area has\nbeen completed.&nbsp; &nbsp;<\/p>\n\n\n\n<p>Gorgas 205 continues to move along on schedule.&nbsp; That space\nis scheduled to be completed by November 15.&nbsp; <\/p>\n\n\n\n<p>Along with the good news comes the dreadful sound of the\nsaw-cutting in the elevator shaft.&nbsp; What you have been hearing for the\npast few days is the very noisy process of saw-cutting the edges around the\nexisting elevator shaft in order to get ready for installation of the new shaft\nand new elevator car.&nbsp; The work is progressing slowly upward through the\nbuilding, but should be completed before the end of September.&nbsp; <\/p>\n\n\n\n<p>Once the restrooms on first floor have been inspected and turned\nover to us for use, the contractor will begin work in the restrooms on\n2M.&nbsp; <\/p>\n\n\n\n<p>The restroom on second floor is expected to be completed in early\nNovember.&nbsp; Once that restroom is turned over to us, the work in the\nrestrooms on 3<sup>rd<\/sup> floor will begin.&nbsp; <\/p>\n","protected":false},"excerpt":{"rendered":"<p>You will begin to see some big changes next week on the first floor of Gorgas.&nbsp; The construction barrier around the restroom area is scheduled to be taken down.&nbsp; Then, ceiling tiles and carpet will be put back into place and the walls will receive final touch-up paint.&nbsp; A new water fountain (with bottle-filler and &hellip; <a href=\"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2019\/09\/12\/september-11-update\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">September 11 Update<\/span><\/a><\/p>\n","protected":false},"author":559,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-730","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/730","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/users\/559"}],"replies":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/comments?post=730"}],"version-history":[{"count":1,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/730\/revisions"}],"predecessor-version":[{"id":731,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/730\/revisions\/731"}],"wp:attachment":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/media?parent=730"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/categories?post=730"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/tags?post=730"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}