{"id":956,"date":"2024-06-03T14:18:39","date_gmt":"2024-06-03T14:18:39","guid":{"rendered":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/?p=956"},"modified":"2024-06-03T14:20:51","modified_gmt":"2024-06-03T14:20:51","slug":"gorgas-library-core-support-phase-ii-update-and-road-closures","status":"publish","type":"post","link":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2024\/06\/03\/gorgas-library-core-support-phase-ii-update-and-road-closures\/","title":{"rendered":"Gorgas Library Core Support, Phase II Update, and Road Closures"},"content":{"rendered":"\n<p>Phase II of the construction project is almost complete, with contractors finishing up the final tasks. The fences on the northeast side of the building have been removed, revealing the newly completed<br>mechanical courtyard. Additionally, new landscaping has been installed to enhance the surroundings. An extension has been granted to the contractor to facilitate the installation of new power poles along<br>Capstone Drive. This installation work is scheduled to take place from May 28 to June 7, following which the construction fence will be removed.<\/p>\n\n\n\n<p>June 10 to 14, Capstone Drive will be closed for repaving and striping. During this time, ADA Parking will be relocated to 7th Street, adjacent to Garland Hall.<\/p>\n\n\n\n<p>Here is a map of the area so you can familiarize yourself.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"689\" height=\"572\" src=\"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/files\/2024\/06\/closures.jpg\" alt=\"\" class=\"wp-image-957\" srcset=\"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/files\/2024\/06\/closures.jpg 689w, https:\/\/apps.lib.ua.edu\/blogs\/renovations\/files\/2024\/06\/closures-300x249.jpg 300w, https:\/\/apps.lib.ua.edu\/blogs\/renovations\/files\/2024\/06\/closures-676x561.jpg 676w\" sizes=\"auto, (max-width: 689px) 100vw, 689px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Phase II of the construction project is almost complete, with contractors finishing up the final tasks. The fences on the northeast side of the building have been removed, revealing the newly completedmechanical courtyard. Additionally, new landscaping has been installed to enhance the surroundings. An extension has been granted to the contractor to facilitate the installation &hellip; <a href=\"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/2024\/06\/03\/gorgas-library-core-support-phase-ii-update-and-road-closures\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Gorgas Library Core Support, Phase II Update, and Road Closures<\/span><\/a><\/p>\n","protected":false},"author":396,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-956","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/956","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/users\/396"}],"replies":[{"embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/comments?post=956"}],"version-history":[{"count":3,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/956\/revisions"}],"predecessor-version":[{"id":961,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/posts\/956\/revisions\/961"}],"wp:attachment":[{"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/media?parent=956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/categories?post=956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apps.lib.ua.edu\/blogs\/renovations\/wp-json\/wp\/v2\/tags?post=956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}