May 21, 2019 Gorgas Library Renovation Updates

Rooms 102 and 104 (Computer Lab) remain closed for the installation of a new sewer line and fresh water supply line.

Partitions are going up around the new staff elevator from the basement to the 5th floor.

A partition is in place around rooms 113A and 104A in preparation for the restroom expansion.

Java City remains closed.  Vending machines with cold drinks and snacks are located on the first floor next to room 100.

A partition for the renovation in Java City will go up today and tomorrow.  This partition and the staff elevator partition will block the entrance to the Music Library.

Anyone needing assess to the Whisper Booths in the Music Library, please seek assistance at the Information Desk. 

The Java City partition will also block the south stairwells to the second floor.  Please use the public elevators to access the upper floors.

Furniture is being removed on the second floor next to the Circulation Desk in preparation for renovation of the elevator lobby, adjacent areas, and Gorgas 205. This furniture is being moved to 4M for additional seating.

Study space and computers are located on the third floor.  Additional study spaces are located on 2M and 4M.